Adina St Miranda
Project details
Scope of Work: 1. Ausgrid Defect Report & Safety Assessment * The property owner received a defect notice from Ausgrid regarding serious safety concerns at the existing Point of Attachment (POA). * The timber mounting board at the POA was severely deteriorated and rotten, while the adjacent metal guttering was heavily corroded and rusted. * These defects compromised the structural integrity of the overhead service attachment and posed significant electrical safety risks. 2. Level 2 ASP Service Disconnection & Make-Safe * Attended the property to assess the reported defects and associated electrical hazards. * Safely disconnected and isolated the existing overhead electrical service to allow the necessary structural repairs to be carried out. * Made the electrical installation safe before the commencement of repair work. 3. POA Structural Repairs by Qualified Tradesperson * Coordinated with a professional carpenter to arrange repairs to the damaged POA mounting structure. * Allowed the necessary timber and gutter repairs to be completed before proceeding with the electrical reconnection. 4. Overhead Service Replacement & Reconnection * Removed and replaced the existing overhead service mains with new compliant service cables. * Reinstalled and securely connected the overhead service to the repaired Point of Attachment. * Completed the necessary Level 2 ASP service reconnection works to restore the property’s electricity supply. 5. Electrical Testing & Defect Rectification * Carried out the required electrical safety inspections, testing and verification following completion of the works. * Completed the electrical rectification works associated with the Ausgrid defect notice in accordance with applicable Australian Standards and network requirements.
Ratings and comments
Loading comments…
