Curtin Ave North Wahroonga
Project details
Scope of Work:
1. Electrical Service Disconnection & Reconnection
* Safely disconnect and isolate the existing electrical supply before commencing the upgrade works.
* Complete all necessary Level 2 ASP electrical disconnection and reconnection works.
* Restore power to the property following completion of the electrical upgrades and safety testing.
2. Consumer Mains Replacement
* Remove and replace the existing consumer mains with new appropriately sized cables to accommodate the upgraded electrical installation.
* Complete all necessary cable connections and associated electrical works.
3. Main Switchboard Panel Replacement & Wiring Reorganisation
* Remove the existing switchboard panel and install a new compliant distribution panel.
* Inspect, identify and reorganise the existing electrical wiring.
* Reroute and neatly arrange the internal cables to improve cable management, circuit identification and electrical safety.
* Reconnect and clearly label all existing electrical circuits.
4. Main Switch & Ceramic Fuse Upgrade
* Remove and replace the existing main switch with a new appropriately rated main switch.
* Remove the outdated ceramic fuse holders and associated components.
* Replace the old ceramic fuse protection devices with modern, compliant circuit protection devices, including RCBOs where required.
* Upgrade the associated wiring and electrical accessories to meet applicable Australian electrical safety requirements.
5. 14.25kW Rooftop Solar PV System Installation
* Supply and install a 14.25kW rooftop solar photovoltaic (PV) system.
* Install solar panels, roof mounting systems, DC cabling and associated electrical protection devices.
* Complete all necessary solar panel wiring and electrical connections.
6. 15kW Hybrid Inverter Installation
* Supply and install a 15kW hybrid inverter.
* Connect and configure the inverter with the solar PV system, electrical supply and battery storage system.
* Complete all necessary AC/DC wiring, protection arrangements and system configuration.
7. 47.92kWh Battery Energy Storage System Installation
* Supply and install a 47.92kWh battery energy storage system (BESS).
* Complete all necessary battery cabling, electrical connections and associated protection devices.
* Integrate the battery system with the hybrid inverter to enable solar energy storage and energy management.
* Configure and commission the battery storage system.
8. Electrical Testing, Commissioning & Compliance
* Carry out all necessary electrical safety inspections, testing and system commissioning.
* Verify the upgraded consumer mains, switchboard, main switch, circuit protection devices, solar PV system, inverter and battery installation.
* Complete the required compliance documentation in accordance with applicable Australian Standards and electricity network requirements.